Pastor Aquiles March 2020

March 2020 did first outreach at this chapel.
Walls were up and had a roof but were in need of finishing with windows, doors, floor, electrical, plaster walls and bath rooms installed.

Outreach went well with good response, had prayer with pastor before leaving that God would provide, and we encouraged him.

July 16 met with pastor and went over work that needed to be done on getting floor graded and level.
Getting cost on material to pour floor.
Had prayer for God to provide.

July 29 visited the site to evaluate the grading in preparation for the pouring of concrete floor.

Went over details of what needed to be done

 

Having a look around